Horsey is back in his stable. After this he is all ready for the GAD. All work completed expertly by Marc Jones from Enzotech. Place car on a hoist. Remove all road wheels and rear inner guards. Drain cooling system. Remove assy belts and a/c compressor..Remove cambelt covers to access belts. Replace camshaft drive belts and tensioner bearings. Clean belt covers and refit. Refit a/c compressor and fit new assy belts. Drain engine oil and gearbox oi, Gearbox overfull with engine oil. Remove gearbox pan. Remove selector shaft and replace selector shaft seals. Replace bush in selector shaft. Refit shaft into housing and refit internal gear shift parts. Clean gearbox pan and gasket surfaces. Check and adjust the gear shift. Refit gearbox pan with a new gasket. Refill gearbox oil. Replace engine oil filter and refill engine oil. Replace spark plugs. Remove and refit distributor caps and leads to check. Replace fuel injectors. Remove and refit the steering rack. Disassemble steering rack and rebuild with new bushes. And new mount bushes. Remove all four shocks to be rebuilt. Remove springs and have re-powder coated. Replate spring retainers. Refit springs to rebuilt shocks with new platform rubbers etc. Refit all shocks into the car. Topup A/C gas and check operation. Take the car over for the front and rear wheel alignment. Degrease under the rear of the car. The lower half of the engine and engine bay, and all suspension components. Test drive and recheck fluid levels. Check and adjust idle mixtures.